We’re building the network that will transmit power generated from solar and wind farms, unlocking up to 4.5 gigawatts (GW) of new network capacity in the Central-West Orana Renewable Energy Zone (REZ).
We aim to leave a legacy that extends far beyond the completion of the transmission infrastructure through the delivery of positive, long-term benefits for local communities.